Shakespeare Tower, Barbican

Date: November 2015

Requirements

  • Stud Wall Removal
  • Fitting of Stud Walls with Acoustic Insulation
  • Carpentry
  • Redecoration and Repair Work
  • Rewiring
  • Floor Covering Renewal
  • Woodwork Renewal
  • Disposal of all Demolition Waste
  • Electrical Works
  • French Polishing for all Windows

What did the Shakespeare Tower require?

The owners of the Shakespeare Tower flat required a complete recreation of the interior layout. This included the creation of a new lounge area via the removal of several walls and the creation of a walk-in wardrobe in the bedroom.

What did MC Designers do?

As well as creating the new lounge area by wall demolition and creating the remaining wall to create the walk-in wardrobe, MC Designers also redecorated the interior including repainting and filling walls and woodwork. They were able to reinstate the door at the entrance following the careful demolition. MC Designers also supplied and fitted floating shelves to the cupboard in the bedroom, along with completing a large amount of rewiring. The carpet in the bedroom was laid as well as the white floor covering across the rest of the flat.